(PAGASA 24-HOUR PUBLIC WEATHER FORECAST as of Saturday, 21 December 2024) π—¦π—¬π—‘π—’π—£π—¦π—œπ—¦: Shear Line affecting Southern Luzon and Visayas. Northeast Monsoon affecting the rest of Luzon. 𝗙𝗒π—₯π—˜π—–π—”π—¦π—§ π—ͺπ—˜π—”π—§π—›π—˜π—₯ π—–π—’π—‘π——π—œπ—§π—œπ—’π—‘: Dinagat Islands will experience Cloudy skies with scattered rains and isolated thunderstorms due to the Shear Line. Possible flash floods or landslides due to moderate to heavy with at times intense rains. Butuan City, Agusan del Norte, Agusan del Sur, Surigao del Norte and Surigao del Sur will experience Partly cloudy to cloudy skies with isolated rainshowers or thunderstorms due to Trough of Low Pressure Area. Possible flash floods or landslides during severe thunderstorms. 𝗙𝗒π—₯π—˜π—–π—”π—¦π—§ π—ͺπ—œπ—‘π—— 𝗔𝗑𝗗 π—–π—’π—”π—¦π—§π—”π—Ÿ π—ͺπ—”π—§π—˜π—₯ π—–π—’π—‘π——π—œπ—§π—œπ—’π—‘: Moderate to Strong winds coming from East to Northeast will prevail with Moderate to Rough seas / (1.5 to 3.7 meters).


Monday, 11 September 2023

Over 1.36M beneficiaries to receive P3B fuel subsidy

Department of Budget and Management (DBM) Secretary Amenah F. Pangandaman has approved the release of P3 billion for the implementation of the Fuel Subsidy to the Transport Sector Affected by Increasing Fuel Prices [also known as the Fuel Subsidy Program (FSP)], which aims to provide assistance to  approximately 1.36 million drivers and operators who were affected by the series of oil price hikes.

“Transportation is the lifeblood of our economy. Bilin po sa amin ni President Bongbong Marcos na tulungan at huwag pabayaan ang ating mga manggagawa sa transport sector. Kaya naman po sisiguruhin namin na mabibigyan sila ng nararapat na tulong mula sa gobyerno,” Sec. Amenah Pangandaman said.

The release of funds in the amount of P3 billion was made upon the request of the Department of Transportation (DOTr), and in accordance with Special Provision (SP) No. 7 of the DOTr-OSEC agency-specific budget authorized under Republic Act (RA) No. 11936, otherwise known as the Fiscal Year (FY) 2023 General Appropriations Act (GAA).

It may be noted that the DOTr’s request dated 9 August 2023 was returned by the DBM on 17 August 2023, due to the noted deficiencies and inconsistencies in the accompanying supporting documents, including the non-submission of the guidelines to be issued by the DOTr, the Department of Energy (DOE), and the DBM, which is required under SP No. 7 in the FY 2023 DOTr-Office of the Secretary (DOTr-OSEC) Budget.

Hence, on 4 September 2023 (Monday), the DBM received the hard copy of the officially-resubmitted request from the DOTr accompanied by the required supporting documents, including a copy of the FSP guidelines dated 31 August 2023, duly-signed by the respective Heads of the DOTr, DBM, DOE, Land Transportation Franchising and Regulatory Board (LTFRB), and Landbank of the Philippines (LBP).

As identified and validated by the LTFRB, in coordination with the Department of Interior and Local Government (DILG), Department of Information and Communications Technology (DICT), and the Department of Trade and Industry (DTI), the 1.36 million target beneficiaries of the FSP will be given a one-time fuel subsidy, with varying rates depending on the applicable mode of transportation, to wit:

-Modernized Public Utility Jeepney (MPUJ): P10,000
-Modernized Utility Vehicle Express (MUVE): P10,000
-Traditional PUJ: P6,500
-Traditional UVE: P6,500
-Public Utility Buses (PUB): P6,500
-Minibuses: P6,500
-Taxis: P6,500
-Shuttle Services Taxis: P6,500
-Transport Network Vehicle Services: P6,500
-Tourist Transport Services: P6,500
-School Transport Services: P6,500
-Filcabs: P6,500
-Tricycles: P1,000
-Delivery Services: P1,200

As provided in the draft Memorandum of Agreement (MOA) submitted by the DOTr, the subsidy shall be released to the DOTr-OSEC, which shall in turn, fully transfer the same to the LTFRB, as the implementing agency.

Based on the master list of eligible beneficiaries certified by the LTFRB, DICT, DTI, and the DILG, the LBP shall distribute the subsidies through the identified modes of payment, upon receipt of instructions from the LTFRB on the procedures, mechanics, and the agreed schedule.

The LBP shall provide the DOTr and the LTFRB the required reports of its successful crediting of the predetermined amounts, in accordance with the timelines provided in the MOA, or as needed, for purposes of monitoring. (DBM/PIA-Caraga)